Waste to Energy plant Stuttgart-Münster

MTA Engineering has executed a workshop design of the steel structure of the boiler building and turbine house as part of the expansion of the waste incineration plant in Stuttgart. The work was carried out as part of the construction of a new power plant with a gas turbine for generating electricity and heat based on natural gas at the plant in Stuttgart-Münster.
Client EnBW
Location Germany
Tonnage 1237 ton
Year 2024