Detailed design of support structures for the treatment building for the waste incineration line at the new Combined Heat and Power Plant in Vilnius. The entire CHP plant project included the construction of a total of three lines for the production of electricity and heat: one waste incineration line and two biomass lines. The high-efficiency cogeneration plant will reduce fossil fuel consumption by thermal waste utilization and provide electricity (90 MW) and heat (230 MW).